As October get's closer so does our projected "breaking ground" date and as of right now everything is still on track. Here are the latest property & building updates:
- We have received word from St. John's Water Management (SJWM) that they have received all of our paper work requesting permission to dig a retention pond and fill in another pond toward the front of the property. As expected they requested some minor changes on the site plans. Currently Parker Mychenburg (site engineer) and our site surveyor are working hand in hand making these changes and the corrections should be submitted back to SJWM.
- Beginning this Saturday 1,000 cubic yards of silicit sand will begin being dropped off at the Crossroads property. Silicit sand is required to be used at the bottom of the filled in retetetion pond and at the bottom of the septic tank site. The silicate sand is unique because it absorbs and drains water in way that it does not hold in the moisture and does not become muddy. This should take approximately two weeks.
- Ministry Center Update - Painting and rearranging of of the Associate Minister's Office is complete. In the main meeting room we have installed a flat screen monitor that will display announcements for visitors and those attending Bible Study on Wednesday nights.
- You can now make capital campaign contributions through our web site: www.crossroadsnsb.org/capitalcampaign and also get even more information on the building project and how you can help.